LASR.net Homepage




Menu

Gavins Point Dam


category : Recreation
Gavins Point Dam

Gavins Point Dam, part of the 1944 Pick-Sloan Plan, plays an important role in the successful operation of the six main stem dams and reservoirs on the Upper Missouri River Basin. The dam was completed in 1957 at a cost of $51 million.


Water released from the five upstream dams is used at Gavins Point Dam for production of hydroelectric power. The Gavins Point Dam generators provide enough electricity to meet the annual needs of 65,000 people. Controlled releases from the dam enhance navigation and minimize erosion on the Missouri River to St. Louis, Missouri. Gavins Point Dam, along with Lewis and Clark Lake, provide $35 million in benefits to the public annually. These benefits include power generation, flood control, recreation, navigation support, and fish and wildlife enhancement.



Hours: Tours of the Power Plant are given daily between Memorial Day and Labor Day from 10 AM to 6 P.M.
Phone: 402-667-7873
Special tours can be scheduled by calling 402-667-7873 weekdays between 9:00 AM and 4:30 PM.

Come visit us in Niobrara, Nebraska

Attractions and Upcoming Events

Chief Standing Bear Memorial Bridge

The "Chief Standing Bear Memorial Bridge" over the Missouri River is approximately 3000 feet long and 80 feet high over the river on the South Dakota side. It links

Niobrara, NE Memorials

Chief Standing Bear

Ponca Chief Standing Bear merely wanted to fulfill a promise; instead, he became part of one of the West's most famous trials. The Chief's son, like many of his tribe, had taken ill after being forced onto a reservation in Oklahoma. On his deathbed, the son uttered a final wish:

Niobrara, NE Indian Heritage

Ponca Tribe Marker

This has been the homeland of the Ponca Indians since earliest recorded history. In 1866, the Federal government signed the treaty of Fort Laramie, which transferred the land to the Sioux without the permission of the Ponca. Treaties made with the government in 1856

Niobrara, NE Historical Markers

Gavins Point Dam

Gavins Point Dam, part of the 1944 Pick-Sloan Plan, plays an important role in the successful operation of the six main stem dams and reservoirs on the Upper Missouri River Basin. The dam was completed in 1957 at a cost of $51 million.

Niobrara, NE Recreation


Things to do Recreation near Niobrara, NE